After a first testing carried out by AZTI at sea (WP1), our partner Zunibal has made some adjustments to the prototype and have performed some lab and tank testing before the new survey at sea planned for later this year. During these sessions, Zunibal sought to optimize the system through laboratory and tank measurements. Photos of the process can be seen below.

Photo 1. Testing at ZUNIBAL’s laboratory in Derio, Basque Country, Spain.

 

Photo 2. Tank at the Port of Gandía, Valencia, for testing transducers

 

Photo 3. Installation of transducer in tank in the Port of Gandía, Valencia

 

Photo 4. Installation of second transducer in tank in the Port of Gandía, Valencia

 

Photo 5. Visualization software during testing at tank in the Port of Gandía, Valencia

 

Photo 6. Preparing system to be tested at tank in ICAR – IEO, Mazarrón, Murcia

 

Text provided by: Iratxe Arraibi Contact: iratxe.arraibi@zunibal.com

Photos taken by: Lucio Calise and Patricia Ordóñez.